Details and Metadata
Printer-friendly version View XML version Download Ecological Metadata Language file
Methods
The methods followed in the creation of the dataset, including description of field, laboratory and processing steps, and quality control procedures
Current Methods
Started: 2012-05-01From summer 2004 to spring of 2013 sampling was done on an event basis with co-located wet-only precipitation collectors; An Aerochemetrics (ACM) and a N-CON Systems (N-CON). Precipitation was collected in the morning after every precipitation event with both ACM and N-CON collectors. Lids open in response to precipitation.
Deposition collection
Started: 2004-07-27A special collector was designed for MDN which is a modification of the wet-only deposition collector used by NADP for other observations. The modifications include replacing the collection bucket with a smaller insulated sampling chimney.
Sampler processes
Started: 2004-07-27The lower portion of the sampler is enclosed and insulated. A small space heater is used to maintain the winter temperature between 10 and 15 °C to prevent samples from freezing. Heat from the interior rises up the chimney to warm the collection funnel which melts ice and snow on contact with the funnel. A ventilation fan pulls filtered air through the sampler during warm weather to moderate the inside temperatures.
Mercury sampling train
Started: 2004-07-27The mercury sampling train consists of an approximately 128-mm diameter, borosilicate glass funnel, an acid-cleaned, wide-bore (3-mm) capillary tube, and a 2-liter, borosilicate glass bottle. The capillary tube is connected to the funnel by a ground glass fitting. The opposite end of the capillary tube is expanded to form a sphere with a diameter slightly larger than the mouth of the sample bottle. A small hole in the sphere allows water to drain into the sample bottle.
Started: 2004-07-27Sample bottles are pre-charged with 20.0 mL of dilute (0.12 M) hydrochloric acid as a preservative to prevent microbial action and provides sufficient chloride ion to complex mercury in solution and prevent conversion to and loss of Hg0
Started: 2004-07-27The field operators receive a pre-cleaned sampling train each week. Every Tuesday, the exposed sampling train is removed using clean techniques and returned to the MDN laboratory, Frontier Global sciences, Inc. in Seattle, WA (Hg Analytical Laboratory, "HAL"), along with the sample bottle containing any collected precipitation.
Started: 2004-07-27All operators wear plastic gloves when handling the sampling train and follow special procedures to avoid contaminating the sample. Any overflow from the bottle is collected and measured to determine the total precipitation amount, but it is not included with the sample sent to the lab.
Precipitation monitoring
Started: 2004-07-27Each site is also equipped with a weighing-bucket rain gauge that provides a continuous record of rainfall amounts. Rainfall is recorded to the nearest 0.01 in. The rain gauge also monitors the precipitation sampler, recording whether the sampler was properly open during wet periods and closed during dry periods.
Past Methods (No longer in use)
Started: 2005-08-01
Ended: 2012-05-01During spring 2013 the sampling frequency changed from event based to the weekly composite sampling that is typical of the network. Precipitation collected over course of one week. Sampling period is Tuesday to Tuesday.
Dataset Fields
Detailed documentation of the fields comprising the dataset, including the type of measurement, units where applicable, and any controlled vocabularies or code lists present in the data
Field Name Caption Description Additional Information SITEID Site ID Site identification code
Measurement type: Nominal DATEON Date On Date and time that sample collection began
Measurement type: DateTime
Date/Time Format:DATEOFF Date Off Date and time that sample collection ended
Measurement type: DateTime
Date/Time Format:RGPPT Precipitation Precipitation amount as measured by rain gauge
Measurement type: Ratio
Units:SVOL Sample Volume Volume of the sample analyzed
Measurement type: Ratio
Units:SUBPPT Calculated Precipitation Precipitation amount, equal to gauge precipitation or, when absent, calculated from bottle catch volume
Measurement type: Ratio
Units:HGCONC Mercury Concentration Concentration of mercury measured in the sample
Measurement type: Ratio
Units:HGDEP Mercury Deposition Deposition of mercury derived from the precipitation and concentration data
Measurement type: Ratio
Units:SAMPLETYPE Sample Type Measurement type: Nominal QR Quality Code Qualtiy assurance code, including invalid data (QR = C)
Measurement type: Nominal NOTES Lab Notes Notes attached by lab
Measurement type: Nominal YRMONTH Sample Year-Month Month and year of sample
Measurement type: DateTime
Date/Time Format:DATEMOD Date Mod Unknown
Measurement type: DateTime
Date/Time Format:Sampling Equipment
Equipment and software used to collect data, including how that equipment was used.
Current Equipment
Precipitation collector
Started: 2004-07-27Aerochemetrics (ACM) automated precipitation collector.
Automated precipitation collector
Started: 2005-08-01N-CON Systems (N-CON) automated precipitation collector.
Precipitation collector
Started: 2005-08-01N-CON Systems (N-CON) automated precipitation collector.
Site Characteristics
The spatial extent of the dataset site coverage, and descriptions of the spatial extent and context for the data collection
- Site Description
West slope of Mount Mansfield in an open field at the Proctor Maple Research Center. Site has a west aspect and an 8% slope
Minimum Altitude: 399 meter
Maximum Altitude: 399 meter